Tripp Lite PDU 3-Phase Switched 240V 18kW C13 C19 IEC309 30A Red 0URM
Click image to enlarge or see more views.
Volume Discounts
Contact us and save even more if you meet these Big Deal qualifications.Purchase a minimum of $10,000 of hardware, or $500 of cables to qualify.
Not enough in stock? No problem! We can ship your large quantity order direct from Tripp Lite's warehouse. These orders typically ship within 2-3 business days.
Tripp Lite PDU 3-Phase Switched 240V 18kW C13 C19 IEC309 30A Red 0URM
Highlights
Tripp Lite 3-phase Metered PDU / Power Distribution Units offer real-time local reporting of current levels in amps via set of 3 built-in digital meters. Enables visual monitoring of PDU current levels to preserve proper loading balance and prevent circuit overloads as additional equipment is added. Offers reliable rackmount multi-outlet power distribution from any protected UPS, generator or mains input power source. High quality design includes rugged all-metal housing and secure rackmount installation with included mounting accessories.
At a Glance
1% billing-grade accuracy; Digital display reports detailed status information
IEC309 30A Red (3P+N+E) 415V 3 phase input; 6 ft. / 1.8m line cord
Reports voltage & load per-outlet or per phase via ethernet interface
Overview
Tripp Lite 3 phase Switched PDU / Power Distribution Unit offers advanced network control and monitoring with the ability to turn on, turn off, recycle or lock-out power to each individual receptacle, monitor site electrical conditions and remotely monitor output power consumption per-phase or per-receptacle. PowerAlert interface supports remote control and custom notification of user-specified conditions via email, secure web, SNMP, Telnet or SSH interface. Individually switched outlets can be controlled in real-time to remotely reboot unresponsive network hardware, or be custom programmed for user-defined power-up and power-down sequences to ensure proper startup of interdependent IT systems and prevent inrush-related overloads as network equipment is first energized. Unused PDU outlets can be electronically locked off to prevent the connection of unauthorized hardware. PDU output current consumption in amps per-phase or per-receptacle can be displayed locally via visual meter or remotely via web/network interface to warn of potential overloads before critical IT mains or branch breakers trip. Highly accurate current metering offers +/-1% billing-grade current monitoring and recording ability for each output phase, breakered load bank and individual outlet.
You may be able to save even more on your order if you meet the following Tripp Lite BIG DEAL qualifications:
Purchase a minimum of $10,000 of hardware, or $500 of cables to qualify.
Not enough in stock? No problem! We can ship your large quantity order direct from Tripp Lite's warehouse. These orders typically ship within 2-3 business days.